DR Congo · PPP Build-Operate-Transfer

Kasindi–Beni–Butembo Corridor

Upgrading 134 kilometres of the Great Lakes region's busiest cross-border trade route — from the Uganda–DRC border at Kasindi, through Bulongo and Beni, to the commercial hub of Butembo in North Kivu province.

Corridor length
134 km three sections
Delivery model
PPP-BOT
Location
North Kivu, DRC
Stage
Structuring
Overview

The trade artery of the Great Lakes.

The Kasindi–Beni–Butembo highway is the economic lifeline of the DRC's North Kivu province. It begins at Kasindi, the country's busiest eastern border post with Uganda, runs north-west through Bulongo to the city of Beni, then turns south-west to Butembo — one of eastern Congo's great commercial centres.

For years, the road's poor condition has been a brake on the region's potential: slowing the export of coffee, cocoa and agricultural produce to Uganda and the East African market, raising transport costs for traders on both sides of the border, and cutting communities off from services.

Uhuru Infrastructure is developing the corridor's upgrading to an all-weather paved standard as a PPP Build-Operate-Transfer concession — backed by a full traffic study and economic evaluation completed in 2026, and coordinated with the governments and road authorities of the region.

Kasindi (UG–DRC border) Bulongo Beni Butembo KASINDI–BENI–BUTEMBO · DR CONGO
134km
Total corridor length
3
Road sections
2
Countries connected
The Corridor

Three sections, one route to market.

The corridor is developed and analysed in three sections, each with its own traffic profile — from the border crossing at Kasindi to the commercial heart of Butembo.

SectionFrom — ToCharacterStatus
S01Kasindi → BulongoBorder-post approach carrying cross-border freight from the Uganda sideUnder construction
S02Bulongo → BeniLink to Beni city — administrative and logistics centre of the areaUnder construction
S03Beni → ButemboThe corridor's busiest stretch, serving Butembo's major trading economyTo be advanced under the concession

Works on the Kasindi–Beni sections are being undertaken by DOTT Services Limited; the Beni–Butembo section is the focus of significant further development under the PPP-BOT structure.

Trade & Economy

Why this road moves a region.

North Kivu's economy runs on agriculture, mining and cross-border trade. Every one of them depends on this corridor.

Exports

Coffee, cocoa and agricultural commodities flow through the Kasindi border post to Uganda and the wider East African Community — the corridor is their route to market.

Enterprise

An all-weather road unlocks induced investment: farms, small and medium enterprises and larger firms locating along a corridor they can finally rely on.

Integration

Stronger connectivity between the DRC and Uganda supports regional integration and stability in eastern DRC — commerce where distance and isolation once ruled.

"The current state of the road is a hindrance to the development of the project area. The upgraded corridor removes that ceiling."
Objectives

What the project will deliver.

The corridor's purpose, as established by the traffic study and economic evaluation.

01

All-weather reliability

Upgrading 134 km to an all-weather paved standard — ending the seasonal closures and punishing surface conditions that throttle freight movement today.

02

Lower transport costs

Reduced vehicle operating costs and journey times for the trucks, buses and motorcycles that carry the region's people and produce.

03

Boosted cross-border trade

Faster, more predictable movement through the Kasindi border post — deepening trade between the DRC, Uganda and the East African Community.

04

Growth the region can build on

Wider economic impacts — induced investment, new enterprise and improved access to services — for the millions who live in the corridor's influence area.

Where We Are

Project status.

The corridor's economic case is complete; concession structuring is under way.

  • Completed

    Traffic study

    Corridor-wide traffic surveys and demand forecasting across all three sections, including generated and diverted traffic analysis.

  • Completed · June 2026

    Economic evaluation

    Full socio-economic review of the project influence area and economic analysis of the corridor upgrading, with sensitivity testing.

  • In progress

    PPP-BOT structuring

    Concession structuring and coordination with government counterparts in the DRC and the region.

  • Next

    Financing & full corridor delivery

    Financial close and completion of the corridor to a uniform all-weather standard, followed by long-term operation and maintenance.

Also in our portfolio

Kampala–Bombo Expressway

A four-lane PPP expressway on Uganda's key northern artery — with full feasibility, ESIA and resettlement documentation.

View Project